Fire Water Upgrade

Project scope included improvements to firewater systems, additional pumps, re-routed piping and refurbished tankage. Onyx performed front-end engineering through detailed design.

Perimeter Security System Project

Scope included installation of full perimeter security system including lighting, fencing, card reader, cameras, and all infrastructures (electrical/fiber optic) to support devices. Onyx provided front-end engineering, detailed design, construction support and commissioning support.

Security Main Entryway Project

Scope of the project included installation of a new security building with access control and video surveillance associated with new plant access points. Onyx was responsible for engineering and design for the installation of card readers, barrier gates, turnstiles, cameras, area and street lighting and all electrical and fiber optic infrastructure and civil structural work required for the new installation.

Fire Water Upgrade

Scope of project includes AFE estimating, front-end engineering and detailed design on firewater system upgrades to Refinery complexes. Project is progressing in stages by areas of criticality. Scope includes all mechanical, civil/structural and electrical requirements for piping, pumps, and tankage required